Engineering
Reranker economics
A short reading path on when reranking is worth the cost in proposal retrieval: quality lift, latency budget, and evaluation method.
The reranker that paid for itself
How a second-stage reranker changed retrieval quality enough to justify its latency and cost.
Retrieval latency budget
The practical latency envelope for retrieval-heavy proposal drafting.
Retrieval eval pillar
The evaluation approach behind retrieval quality claims.